An anthracite roller shutter fully lowered on a sandstone cottage, a flat winter sky. Wide view of the whole elevation.

Plantation shutters usually take 6 to 10 weeks from the measure to fitting in the UK, because most are made to order overseas. Some UK-made or fast track ranges take 2 to 4 weeks. External roller shutters typically take 2 to 6 weeks. Fitting is quick: around 1 to 3 hours per window for plantation shutters, and 2 to 4 hours per opening for external roller shutters, so a whole house is usually done in a day or two.

Key points

  • Plantation shutters: 6 to 10 weeks typical, 2 to 4 weeks for fast track ranges.
  • External roller shutters: 2 to 6 weeks typical; special colours and security slats take longer.
  • Spring and early summer are the busiest months, so order early if you want shutters for summer.
  • Planning permission, if needed, adds 8 weeks or more before anything is ordered.

Lead times by type

Typical UK lead times, measure to fitting, 2026
ProductTypical lead timeFitting time
Plantation shutters, standard range6 to 10 weeks1 to 3 hours per window
Plantation shutters, UK-made or fast track2 to 4 weeks1 to 3 hours per window
Tracked bifold plantation shutters7 to 11 weeksHalf a day to a day
External roller shutters, standard colour2 to 5 weeks2 to 4 hours per opening
External roller shutters, special colour or large4 to 8 weeksHalf a day per large opening
Security shutters (certified)4 to 8 weeksHalf a day to a day
Velux roof window shuttersOften in stock to 2 weeks1 to 2 hours per window

What happens between measure and fitting

  1. Survey and measure: 30 minutes to 2 hours, depending on the number of windows.
  2. Quote and choices: material, colour, style, louvre size or slat, drive.
  3. Deposit and order: the order goes to manufacture.
  4. Manufacture: the bulk of the lead time.
  5. Shipping and quality check: longer for overseas production.
  6. Fitting: usually one visit, plus an electrician for wired external shutters.

What causes delays

  • Seasonal demand in spring and early summer.
  • Shipping delays for overseas manufactured plantation shutters.
  • Non standard colours, stains and special shapes.
  • Planning permission or listed building consent that has to be granted before ordering.
  • Building work that is not finished: plastering, new windows or flooring.
  • An electrician who needs a separate visit for wired motors.

How long does fitting take?

Plantation shutters are fitted by fixing the frame into the reveal, hanging the panels and adjusting the hinges and louvre tension. A competent fitter does an ordinary window in an hour or two and a bay in half a day. A 3 bedroom house is usually a one day job.

External roller shutters take longer per opening because the box and guides are fixed to masonry, the curtain is fed in and the motor limits are set. Two to four openings in a day is typical. Wired motors also need connecting, which may be done on the same day or by a separate electrician.

Tips if you need shutters by a date

  1. Book the survey as early as possible; the clock starts when the order is placed.
  2. Ask for the lead time in writing on the quote.
  3. Choose a standard colour and style if time matters more than a custom finish.
  4. Check whether a fast track or UK-made range is available.
  5. For summer heat, book external shutters by early spring.

Frequently asked questions

How long do plantation shutters take to make?

Usually 6 to 10 weeks from the order, because many are made overseas. Some UK-made ranges take 2 to 4 weeks.

How long does it take to fit shutters?

Around 1 to 3 hours per window for plantation shutters and 2 to 4 hours per opening for external roller shutters.

Can shutters be fitted in one day?

Yes. Most homes are fitted in a single day once the shutters have been made.

Why do shutters take so long?

They are made to measure for each window. Manufacturing, finishing and shipping take most of the time.

Sources and further reading